Custom mold base
Plate list, pocket layout, bores and threads cut to the drawing you already have.
Mold base · China
If you are searching for a Chinese mold supplier, you are probably comparing three or four quotes for the same drawing and finding that they are not on the same basis. This page is about the part we make: mold bases, mold frames and machined plates, plus complete mold builds when the cavity and core are part of the order. We are the factory, in Qingxi, Dongguan — not a trading company quoting someone else’s shop.
The phrase gets used for three things, and the price difference between them is enormous. It is worth being precise before you compare anything:
We are the second kind, and we also take on the first when the order includes cavity and core inserts. If you only need plates cut to a drawing, that is a shorter conversation.
A mold base quote is steel, machine hours, heat treatment if the drawing calls for it, inspection, packing, and the delivery term. Two quotes for the same drawing usually differ on the first two, and it is worth asking which:
The grade on the drawing decides the plate cost more than anything else. P20 (1.2311/1.2312) and 718 are the common pre-hardened choices; S50C is the economical one for plates that carry no cavity; 4Cr13, 420H, S136H and H13 come in when corrosion, polish or heat treatment matter. A quote that does not name a grade is not a comparable quote.
Pockets, bores, threads, water lines and grinding are separate operations on separate machines. A frame with deep pockets and a 0.02 mm position callout on the pillar bores costs more to make than a plain stack of the same size, and the difference shows up in the hours, not in the steel.
What the price does not include is just as important: ocean freight, insurance, terminal handling, import duty and inland delivery depend on the delivery term at the foot of the quote. We do not publish FOB prices, because the same drawing can swing with the grade and the machining — the number that means something is the one against your drawing. How to read FOB, CIF and DAP on a mold base quote →
7–10 day lead time is typical from an approved drawing to shipment. That is possible because the machining stays in one building: 20+ CNC machining centres, CNC milling, EDM, wire-cut and deep-hole drilling, two shifts, and a 2,000 m² plant with 50+ staff. Nothing is sent out and waited on.
What pushes a date out is real work, not queue: roughing a thick plate before finishing, a stack with several heat-treatment steps, or a grade that has to be brought in. Those get their own date in the quote, and we would rather give you a real one than a fast one.
Every base is measured on a CMM before dispatch and the record travels in the crate. If your QA department needs the scan before the crate leaves, ask for it on the order and we will send it ahead of shipment.
Packing is export crates with the plates blocked so they cannot shift, faces protected, and the crate marked to your instructions. What actually ships in a crate →
This applies to us as much as to anyone else on your shortlist. None of it needs a factory visit.
Fourteen product families. These are the ones a mold base buyer usually starts with.
Plate list, pocket layout, bores and threads cut to the drawing you already have.
Family and single-material frames with ejection, cooling and slide space allowed for.
Catalogue patterns in S50C and P20, taken from stock.
Heavier frames for aluminium and zinc dies.
Base, cavity and core inserts, ejector system, assembly and spotting.
Ground faces held to ±0.02 mm, Ra 0.8 µm.
Other grades on request — tell us what the drawing specifies and we will confirm availability.
1 set MOQ. Payment is 50% deposit with the order and 50% before shipment; credit terms are not offered to new customers.
