Spare parts for a mold base: the record the first order has to leave
A guide bush wears out two years after the base was shipped. The replacement has to fit a bore that is already in your press — and the only thing that makes it fit is the record the first order left behind.

Most spare-part requests reach a mold base supplier as a photograph and a part name: “one guide bush, same as before”. It is not a small order. A spare component has to fit a bore, a thread or a sliding surface already installed in your tool, and that mating half cannot be changed to suit the new part. What makes the replacement straightforward is not the part; it is the record the first order left behind. This note is about that record, and about the lines worth adding to the first purchase order while the base is still on the drawing board.
The mating half is the drawing. A guide bush is sized to a bore in the plate, an ejector pin to a hole through the ejector plate and the core, a screw to a tapped hole with a defined thread and depth. Those features stay in the tool. The replacement must be made to them, not to the worn component you took out. That is the same interface-versus-free-area distinction that governs a second complete base: only the interfaces have to be reproduced, and on a spare order the interface is nearly the whole part.
A set number and a revision letter come first. Every plate leaving our shop is marked; the marks are the cheapest traceability an order can buy. The set number says which base the component belongs to, the plate number which plate, and the revision letter which drawing was current when the bores were cut. What a mold base order contains explains why those marks are worth specifying, and how a drawing change reaches the machine why the letter belongs on every request.
Record the material and its condition, not just a grade. A guide component is not defined by a grade name alone. The supplied condition, surface treatment and hardness state decide how it wears against its partner as the tool warms up. Substituting a nominally similar steel in a replacement half changes the wear pair. The delegation hidden in “or equivalent” is risky on a first order; on a spare it is worse, because the matching half is no longer beside it. Hardness after machining sets out why the state belongs in the specification.
Keep measured values, not a callout repeated from the drawing. Our own callout for fitting and ground faces is ±0.02 mm, and ground faces are finished to Ra 0.8 µm — our own callout, not a general-standard claim. A replacement order needs the actual value recorded for the bore, its position and its datum, in the state in which it was measured. What an inspection record proves makes the point: a report saying only “OK” describes a decision, not a size. Ask for actual values while the base is still in the shop.
Do not measure the worn part as the master. A bush that has run two years is no longer the size it was made to; it has been polished by the pin and possibly damaged during removal. Ordering to that number reproduces the wear, not the fit. A component that failed early often failed because of alignment, lubrication or heat, not because it was the wrong size. Cold fit, hot bind describes how a temperature difference between the two halves can consume the clearance. Replacing the part without asking why it wore leaves the cause in the tool.
Standard hardware still needs its designation. Screws, dowels, ejector pins and water fittings are catalogue parts, but not generic ones: thread series, length, head style and port thread all vary. A blind tapped hole does not accept a longer screw, and cooling-channel ports cut for one thread form do not accept a plug cut for another. Ask the first order for a hardware list with part designations, not a count of “standard fittings”.
Put the spare list on the first purchase order. Deciding what to keep on the shelf is a scheduling decision, cheapest while the plates are being programmed rather than while the press is stopped. Terms for a new customer are a 50% deposit with the order and 50% before shipment, with no credit terms; the four dates in an order explain why the window between those payments is where a buyer can still add an item without disturbing the queue. Spares cut alongside the base share the setup, the inspection record and the crate; a single part ordered later has to rebuild all three.
Decide who keeps the record. The brand, the toolmaker and the base shop each hold a different part of the file, and who owns the drawing is often settled only when something goes wrong. Assume nothing: keep your own copy of the plate list with set and revision marks, the measured values, the hardware designations and photographs of the assembled stack before shipment. Store it with the tool's maintenance file rather than the purchasing thread, where it will still be found two years on.
For buyers sourcing from China, the file matters more than the freight. A replacement component is not costly because of the part; the cost is the press waiting while a description is clarified across time zones. A Chinese mold base supplier can make a correctly fitted spare from a set number, a revision letter and one measured bore; it cannot do so from a photograph and a good intention. Send the records with the request and ask for a written restatement of which bore, which material and which finish will be used before cutting. That is one concrete part of what buying a mold base from China actually involves: distance is manageable when the controlling information travels in the same package as the order.
A workable spare-parts request therefore carries eight things: the set number; the plate number; the drawing revision; the name and position of the component; the mating feature it must fit; the recorded bore or thread value and its datum; the material and condition; and the quantity with the date you need it. Add a photograph of the plate marking rather than of the loose part, and say whether the mating half is still in the press. What to send with a mold base RFQ covers the original enquiry; a spare request is the same discipline applied to one component, with less room for assumptions.
The commercial value is simple: a base that can be maintained without a re-measurement exercise stays in production longer. Ordinary mold bases from our Dongguan, China mold base lines usually ship in 7–10 days; capacity is 2,000+ sets and pieces per month; and you deal directly with the factory that cut the original bores, so the record and the machine are in the same place. If you are placing a first order, ask for the plate markings, measured values and hardware list as part of the delivery — our mold base components line covers the parts a frame order typically includes.